Key metrics
Product | Typical dimensions |
| Length | 13.5m |
| Width | 4.2m |
| Height | 4.2m |
Packaged Plant Rooms (PPR) are preassembled, factory-tested MEP modules designed using DfMA to accelerate delivery, improve programme certainty and quality. BIM-coordinated and maintainable, they minimise person hours on site, reduce risk and disruption, and integrate heating, cooling, water and controls, ensuring compliant plant for healthcare, commercial, infrastructure and regulated environments.
- Heating and cooling: heat pumps (air/water/ground), CHW/LTHW generation, thermal stores, plate heat exchangers
- Energy systems: CHP, boilers (gas/oil/electric), flues and dilution systems, BEMS integration, metering
- Water systems: cold water storage, booster sets, filtration and treatment, softeners, dosing
- Supports main plant items such as pumps, chillers, fans, plate heat exchangers, Electrical switch panels
- Ventilation systems, DX Systems and Controllers
- Leak detection and evacuation systems
- Electrical switch panels, ATS, Harmonic Filters
- Electrical and controls: distribution boards, control panels, BMS field devices, fire alarm interfaces, emergency lighting in plant space
- Full Electrical and controls wiring installation, testing and certification
- Building fabric: modular enclosures, access doors, louvres, platforms and handrails, acoustic and thermal insulation
- Ancillaries: chemical dosing, pressurisation units, expansion vessels, strainers, valves, gauges, drip trays, leak detection
- Structural/support: skid frames, bases, lifting frames, vibration isolation, builder work details for openings and plinths
- DfMA-led engineering using repeatable standard modules adapted to project-specific requirements
- BIM-enabled coordination (3D/4D/5D)
- Maintainability embedded at concept and detail stages
- Commissioning strategy embedded throughout concept and detail stages
- Early engagement to confirm operational requirements and redundancy levels
- Building Regulations, BS, EN and CIBSE guidance
- Pressure Equipment Safety Regulations, PED/UKCA and water regulations
- BS EN 12845 and healthcare HTMs where applicable
- BS 7671 electrical compliance
- Controlled factory environment with testing and QA stage gates
- FAT documentation and BIM aligned asset labelling
- UKCA/Kitemark where applicable and full traceability
- BS 99001 / ISO9001 Quality management
- Factory production EN 1090-2:2009+A1:2011 to Execution Class 3(EX3)
- Just-in-time delivery and lift planning
- Pre-agreed structural interfaces and hook-up methodology
- Fully inspected and electronically auditable QC records
- Cx Level Test Scrips and Factory Acceptance Testing
- FAT testing and full documentation package
- Pre Commissioning support and attendance available
- Programme certainty
- Improved quality and reliability
- Solutions integration
- Offsite Cx Pre Commissioning
- Reduced site risk and disruption
- Simplified maintenance
- Enhanced compliance and traceability
- Removal of site working hours and hot works